PLS (pulse) rising differential outputPLF (pulse) down along the differential output
Tag: plc tutorial
PLC Timer delay time extension
Timer has a maximum time of the time, such as 100ms timer maximum timer time is 32767.7s. As in the project delay time is greater than the value that you want to do, one of the most simple method is to use a timer relay, that is to start a timer time, time time to … Continue reading PLC Timer delay time extension
FX series PLC N:N network
FX1N series PLC respectively above the programming port cover plate removed, insert FX1N-485-BD Communications Board seats, according to the following diagram wiring N:N network.· N:N FX series network features, among the PLC network communication without programming, can be realized through simple settings between each PLC status or the value of shares. • When wiring note shielded … Continue reading FX series PLC N:N network
Mitsubishi FX2N PLC instructions- four-storey elevator control system
1~4 the stairs outside the request button, FU, FD;1~4 floor SQ1~SQ4 floor signals;In the boot button on the control panel signals;Elevator door opening and closing limit switch.Output signal:Lifting light,Elevator lift AC contactor KM1~KM2,Elevator door AC contactor KM3~KM4,The Bell.1. upon the request 1-4 outside staircase and elevator operation status timely response:Increase process, floor upstairs along the … Continue reading Mitsubishi FX2N PLC instructions- four-storey elevator control system
Mitsubishi FX series PLC Delay off timer Ladder diagram and sequence diagram
Mitsubishi PLC PLS sum PLF directive
PLS (Pulse): rising differential output directive.PLF: falling edge of differential output directive.PLS and PLF command can only be used for the output relays and auxiliary relays (does not include special auxiliary relays). M0 in the figure only in the X0 normally open from open to close (X0 rising edge) when a scan cycle for ON,M1 … Continue reading Mitsubishi PLC PLS sum PLF directive
PLC pulse differential instruction using examples
Impulsive differential instruction can be used to test the rising and falling edge of the input pulse, when conditions are met, a narrow pulse signal output. PLS, PLF two instructions.1 PLS instructionsPLS order known as the rising edge of impulsive differential instruction. Its functions are: when a rising edge of the input pulse signal is … Continue reading PLC pulse differential instruction using examples
Extension methods of PLC timer ladder
PLC frequency divider circuit ladder diagram
PLC no operation (NOP), program end (END) command
1. no operation (NOP)NOP: no operationNOP instruction is typically used for the following aspects: Specifies a certain sequence content is empty, blank for use; some short circuit the contacts or circuit, as shown in Figure 7.24 (a), (b) shown cut off some of the circuit, as shown in Figure 7.24 (c), (d) shown in transform … Continue reading PLC no operation (NOP), program end (END) command









