What is the role of not returning off the card?

Drop signal not generally used to reflect the light plate and the alarm, which is characterized in that all the control loop, any signal is not restored, can emit light signal, to remind the personnel on duty or the operator according to the signal to find fault, not omission or false.

Central signaling device there are several? What is the use?

The central signal device has two kinds of accident signal and warning signal. The use of the accident signal is that when the circuit breaker is tripped, the circuit breaker can be used to send out the sound of the buzzer immediately, and the circuit breaker indicator lamp is flashing. The warning signal uses: in … Continue reading Central signaling device there are several? What is the use?

What is the time limit? What is the counter time limit?

In order to achieve selectivity of over current protection should be the segments of the line protection operation principle of time steps to setting, that is from the power source nearer the end time is longer. Each differential of time is 0.5 seconds. Relay operation time and short-circuit current is independent of the size. Period … Continue reading What is the time limit? What is the counter time limit?

How to choose the European table?

Selection of Megger, mainly is to select the voltage measuring range, high-voltageelectrical equipment required to use the high voltage megohmmeter. Low-voltage electrical equipment using low voltage ohmmeter. General principles are: electrical equipment selection of 500 kV 500~1000-Volt megohmmeter; vases, straps, switch should be used more than 2500 v Megger.Megger measuring range selection principles are: to … Continue reading How to choose the European table?

S7-300 hardware configuration and module power consumption calculation method

Using S7300 313C CPU plus IM365 extended a frame of.313C comes with its own 24DI16DO and 5AI/2AO analog input and output, see the manual configuration above CPU can be placed behind the 8 modules, would like to ask, CPU integrated I/O surface to exclude? No matter what CPU can be placed back 8 modules (on … Continue reading S7-300 hardware configuration and module power consumption calculation method

How to use a computer to achieve the same time on the two PLC access?

Recently the communication between two PLC, if you use SIEMENS's own words each cable programming procedure is very troublesome, for which a PLC after pulling down into another PLC again under the corresponding procedures, and online modify variable values and also not easy, so I would like to ask how to at the same time … Continue reading How to use a computer to achieve the same time on the two PLC access?